Townhouse Developments
Cameron Clarke
Interior Features | Carpet with underlay to areas not tiled. Selections from builders range. Splash back wall tile to kitchen, bathroom, ensuite , and laundry from builders range. Internal Light P oints: LED downlights or similar throughout. |
---|---|
Appliances | 600mm fan forced electric oven, 600mm cook top, Stainless steel 1 3/4 bowl sink, Chrome Kitchen Mixer, Handles from builders range. |
Heating/Cooling | All dwellings will contain ducted heating and split system. If development does not allow for this, reverse cycle wall mounted split system heating and cooling to living area with slim line electric radiant panel heaters to bedrooms. |
|
|
Balcony | Yes |
---|---|
Courtyard | Yes |
Landscaping | Yes |
PRELIMINARY WORKS
Site survey soil test and site inspections as and when required.
Building permit application and fees applicable.
Drafting of plans.
Temporary fencing and scaffolding during construction as required.
Home owners warranty insurance.
Three month maintenance guarantee.
GENERAL SITE WORKS
Earthworks including levelling of construction platform over build area and excavation of rocks where required.
Stormwater and sewer drainage requirements covered to legal point of discharge and the sewer connection point.
Connection to mains power supply including conduit and cabling for underground connection of single phase electricity to meter box and electricity supply charge during construction.
Connection of underground telephone conduit and water supply including metering (does not include electricity and telephone consumer account opening fees)(connection only to services that are available.